Construction
work began on the project on 8th June 2005
and is estimated to last for nine months with
a completion date timed for Spring 2006.
Work
in progress: Below are some photo's
showing construction progress.

View from the entrance
with the dressing room area to the right (1-9-05)

View from the upper
floor down towards the dressing room area
(1-9-05)

View looking along
the front of the building (1-9-05)

View of the work to
lay in services and utilities pipe work (16-9-05)

View from the lobby
showing the dressing room doorways (16-9-05)

View showing progress
on the front facade (16-9-05)
View showing part
of the roof over the dressing room block looking
towards where pitches will be sited (16-9-05)

View showing detailed
work on the entrance lobby (4-11-05)

View showing installation
of services and pipe work in the lobby (4-11-05)

View showing all exterior
block work and roof sheeting completed (4-11-05)

View showing installation
of first fixing for mechanical and electrical
services (4-11-05)

View showing wall
preparation for services wiring and pipe work
(4-11-05)

View showing the completed
exterior cladding at the dressing room entrance
(15-12-05)

View showing the completed
exterior cladding including the dressing rooms
and front elevation (22-12-05)

View showing the nearly
completed exterior cladding and the entrance
detail (22-12-05)

View showing the exterior
glazing panels in position (29-1-06)

View showing rear
elevation of the dressing room block (29-1-06)

View showing the entrance
to the dressing room block (29-1-06)

View showing completed
glazing panels from the dressing room block
(29-1-06)

View showing the ground
work for the car parking and access road (24-3-06)
View showing the completed
car park area (31-3-06)

View showing the entrance
roadway (31-3-06)
View showing the completed
paving and work on the exterior railing (31-3-06)

View showing the completed
paving leading to the dressing room block
entrance (31-3-06)
(your